HIGHWAYS...
Crash Barriers (Czech Republic)
The crash barriers on the Highway D1 in Velky Beranov between Prague
and Brno in the highland region were originally hot-dip galvanised. A
lot of salt had been used in order to protect the highway from ice and
snow. After approx. 12 years, the oxidised surface was cleaned and Zinga
was applied by brush. The application took place in August 1994. On 19/09/00
the layer thickness was measured by Mr. Michal Stavar from the company
Grane. He measured between 110 to 148 µm of Zinga still remaining.
Duesseldorf Crash Barriers (Germany)
Testimonial letter from Landeshauptstadt Düsseldorf to Ir. Helmut Schwarz
dated 28/06/99, concerning the good results of the Zinga-application on
road barriers after 10 years.
 |
 |
Mississippi Department of Transport (USA)
The "Corrosion Prevention and Control Update" was issued in 1997. It describes
the research that has been done by the US Army in order to reduce the
costs spent on anti-corrosion protection by 30%. Included is a list of
approved vendors, amongst which Zingametall.
Several bridges are considered to be strategic spots and are therefore
placed under military command. That is why the MDOT is referring to the
research by the US Army for the refurbishment of the bridges over the
Mississippi.
In the press release dated 23/12/99 congressman Gene Taylor announced
the recoating of the I-110 Bridge at d'Iberville with Zinga. This 500
foot bascule bridge is the first of all the bridges over the Mississippi
that will be coated with Zinga: the start of an enormous project in the
USA.
Norwegian Directorate of Roads
Pictures of the bridge in Finnmark, at the time of the inspection in 1999,
7 years after the application of Zinga.
SANEF (France)
Zinga has been used by different companies in the management of roads
in France (SANEF, ASF, SAPRR, SAPN) for the anti-corrosion protection
of vehicles, snow plough shields, crash barriers, fences etc. Photograph
of a crash barrier treated with Zinga by SANEF.
Crash Barriers (Singapore)
Pictures of the application of Zinga on the guard rails of the Ulu Pandan
Road in Singapore. This work was executed on 23 and 24/04/98.
Evaluation report issued by the Land Transport Authority, dated 06/05/99,
expressing their complete satisfaction with Zinga one year after the application
on the guard rails.
|